Experience
Data Centers and Emergency Operation Centers
Midlands Data Center
Papillion, NE
Morrissey Engineering was retained by CoSentry and Alegent Health to develop a TIA 942 Tier 4 data center design for their collocation facility joint venture in Papillion, Neb.
Services Provided
- Mechanical, electrical, and technology design
- Existing building commissioning
- LEED consulting
Design Features
- Four raised floor data center suites; expandable to eight suites
- F-5 FEMA design guidelines with 250 mph wind resistance
- 250 LB/SF floor loading capacity
- Gaseous fire protection for data center suites, electrical and telecommunications rooms
- 24-hour guard station with bullet resistant features
- HIPAA, GLBA and Sarbanes Oxley data access restrictions
- SAS 70 Type II certified
- PCIDSS v1.2 compliant
- PCI certification pending May 2010
- NIST compliance pending June 2010
- 750KVA dedicated UPS systems for each suite along with 2250KVA multi-module catcher bus UPS system for back-up
- Redundant power company circuits and automatic throw over (ATO)
- 6.5MW diesel engine backup generation system with paralleling controls and export capability; expandable to 13MW
- EPA certified generators with fuel polishing systems
- High efficiency N+1 chilled water system with water side economizer (free cooling)
Project
New construction
Square Footage
- 46,000 SF raised floor - expandable to 92,000 SF
- 13,000 SF office space
Budget
$26 million
Completion Date
December 2009
Architect
Altus Architectural Studios